Running Time Equation:
From: | To: |
The movie running time calculation converts the total number of frames in a film to minutes based on the frame rate (frames per second). This is essential for editors, projectionists, and content creators.
The calculator uses the running time equation:
Where:
Explanation: The equation first converts frames to seconds (by dividing by FPS) then converts seconds to minutes (by dividing by 60).
Details: Accurate running time calculation is crucial for scheduling, broadcasting, editing, and ensuring compliance with runtime requirements for festivals or distribution.
Tips: Enter total number of frames and frames per second. Both values must be positive numbers. Common FPS values include 24 (film), 25 (PAL), 29.97 (NTSC), 30, and 60.
Q1: What's the difference between film and video frame rates?
A: Film traditionally uses 24 fps, while video standards vary (25 fps for PAL, 29.97 for NTSC). Higher frame rates like 60 fps are used for smoother motion.
Q2: How do I count frames in my project?
A: Most editing software displays total frames in the timeline. Alternatively, multiply runtime in seconds by your project's FPS setting.
Q3: Why does NTSC use 29.97 fps instead of 30?
A: This historical adjustment was made for color TV compatibility in the 1950s, maintaining backward compatibility with black-and-white broadcasts.
Q4: How accurate is this calculation for variable frame rate media?
A: This assumes constant frame rate. For variable frame rate media, the calculation may not be precise and actual playback time may differ.
Q5: What's the relationship between frames and timecode?
A: Timecode (HH:MM:SS:FF) counts hours, minutes, seconds and frames. Our calculation converts the total frames portion to minutes.