Cement Calculation Formula:
From: | To: |
The cement yard calculation determines how many cubic yards of concrete are needed for a project based on the area to be covered and the desired thickness of the concrete layer.
The calculator uses the following formula:
Where:
Explanation: The formula converts square feet and inches into cubic yards, which is the standard measurement for concrete quantities.
Details: Proper calculation ensures you order the correct amount of concrete, preventing costly over-ordering or project delays from under-ordering.
Tips: Measure the area accurately in square feet and determine the required thickness in inches. Standard slabs are typically 4-6 inches thick.
Q1: Why divide by 81 in the formula?
A: This converts square feet × inches to cubic yards (1 cubic yard = 27 cubic feet = 324 square feet × 1 inch = 81 square feet × 4 inches).
Q2: How much extra should I order?
A: It's recommended to order 5-10% extra to account for spillage, uneven subgrade, and other variables.
Q3: Does this work for irregular shapes?
A: For irregular shapes, break the area into regular shapes (rectangles, circles) and calculate each separately.
Q4: What's the minimum thickness for concrete?
A: Residential slabs are typically 4 inches, driveways 5-6 inches, and heavy traffic areas may need 6+ inches.
Q5: How do I convert yards to bags of concrete mix?
A: One cubic yard equals about 45 80-lb bags of concrete mix. Always check the bag specifications.